Saturday, August 27

Thursday, August 25

Wednesday, August 24

Tuesday, August 23

Jun 2022

Started socks, needed a NO-BRAINER, they got boring
So on Tues Aug 23 & 9pm
I ripped them out, will restart as Jaywalker by Grumperina

Friday, August 19

RETIRED

FRI JULY 29, 2022
5PM
FINALLY RETIRED

Wednesday, April 27

WED APRIL 28

12:19AM
DONE WITH GRAPH

TUE APRIL 27

So, I decided to use Sourball colorway for the umbrellas,  because I have 2 skeins leftover from the hat
But instead of starting both socks at the same point giving me almost matching socks

I staggered the starting point of the yarn for the umbrellas 

9:54pm
Done with umbrellas,  starting handles

Tuesday, April 26

Tue Apr 26

12:46AM
first row of umbrellas in
Decided to use Sourball instead of Lemon Drop

Monday, April 25

MON APRIL 25

1:14AM
5 rows to graph

Sunday, April 24

SUN APR 24

8pm
Clouds done

New Socks Sat Apr 23

Yarn

Started Sat night
Got 4 peaks done

Saturday, April 23

SAT APR 23

 3:45 PM

DONE KNITTING



toes kitchnered

just have to duplicate stitch the umbrella handles

7:21 PM

ONE SOCK DONE

YUP. TOO SMALL


AFTER 2nd pair is done, I'll rip out this pair & make them longer



FRI APR 22

 12:21 AM

FIRST DECREASE DONE

THUR APR 21

 5:17 PM

10 ROWS TO THE TOES


10PM

STARTING TOES

Monday, April 18

Mon Apr 18

1:20AM
ROW 34
DECREASES DONE

Sunday, April 17

EASTER SUNDAY => SUN APR 17

These socks will be too small, ill hang them on the wall as ART.
gauge is 10 st / in & 14 rows
On the 2nd Gusset decrease 
6:46pm, ends woven in
7:16pm 4 decrease
These socks will be tight

Saturday, April 16

SAT APRIL 16

SHIT!!!
Yarn knits up too tight

Friday, April 15

FRI APR 15

12:15 am
Finished leg & 1st row of Heel flap

Thu Apr 14

CRAP! 
FORGOT  6 rows, discovered it when I was on 7th heel flap row
RIP-IT

Thursday, April 14

Wed Apr 13 s, z

11:10pm
finished graph for 2nd sock, still need to weave in ends

both socks on the same needle
started the heel flap


Wednesday, April 13

Tue April 12



Done knitting the graph for 1st sock at 12:05 am
Now to weave in the ends, tighten the holes & duplicate stitch the umbrellas. THEN, I play catch up with the 2nd sock, put them both on 2 circulars & finish the pair

done weaving all the ends in, took 3 hours 
11:57pm
Done with beading of sock #2








Tuesday, April 12

Mon April 11

Recomend Bread tab OR bobbin for each umbrella 
Size 14 steel crochet hook to add the beads
Floss threader if you are stringing the beads on the yarn

When doing the umbrellas INTARSIA,  I separated the two socks & work ONE AT A TIME.
9:24PM, done with beading first sock
IT FITS!

Mon April 11, 2022

Beads
First row of beads in ONE sock
12: 05AM

Monday, April 11

Clouds




looking for the color of the Clouds

Clouds done
Now to knit sky
Sun Apr 10 @ 5:30pm
9pm


Right now 13 ends per socks to weave in
When I add the umbrellas,  I'll have 30 more per sock
WHAT WAS I THINKING?
9:23, yarn blob
11:35 ready for graph
Beads

Saturday, April 9

RECREATING

 made a pair of socks in 2007, 


they ended up with someone else.

in 2010, I created a kit for Whenever ... AGAIN!! 


I knit a pair but don't know where they ended up

I NEVER had a pair for myself, so now, in 2022, it's time to knit myself a pair

I found the pattern in Mar on a thumb drive, bought beads Apr 3rd.

on Sat Apr 9, 2022, I went to Simply Socks & got yarn. 

UNFORTUNTELY, I i bought Madeline Tosh Merino Light instead of Tosh Socks, so I had to go get  size 14 steel crochet hook to add the beads, since I can't string the beads on the yarn. 
the first pair will be knit INTARSIA in the round with 6 colors of umbrellas


colors bought
Madeline Tosh Merino Light, 92.03 gm RainWater
Simply Sock Yarn
Silver Lining 50.33 gm
Cherry Red 51.53
Orange 52.75 gm
Blue 53.30 gm
Purple 51.60 gm
Green 51.46 gm
Finch 51.59 gm

Cast on the clouds at 9pm
got the first 6 done about
11pm